Why is my best engineer doing his real work on Saturday?
Your best engineer does his real work on Saturday because weekdays are eaten by interruptions and supervision. Here is how to fix the week.

Because his weekdays are not his. Your best engineer does his real work on Saturday because Monday through Friday is eaten by interruptions, reviews, questions from younger staff and the supervision that comes with being the person everyone trusts. The weekend is not a work ethic you should reward. It is a structural signal that the workday has been taken from him, and if you read it as loyalty you will lose him and a decade of client relationships with him.
What Saturday work is actually telling you
A senior engineer's job is judgment. Somebody has to decide which of two alignments to carry forward, which submittal comment is real and which is noise, and whether a number is close enough to sign. That work needs long, unbroken attention. It does not fit between meetings.
So the judgment gets pushed to the edges of the day. Early mornings, evenings, and Saturdays. The engineer is not choosing to work weekends because he loves the office. He is choosing the only hours where nobody interrupts him.
Look at the pattern honestly. If your senior people do their drawings, their calculations and their reviews on Saturday, the firm has quietly decided that the person with the most judgment gets the least protected time.
The interruptions are not the problem. The design of the week is
Most firms try to fix this with sympathy. They tell the engineer to take a day off, or they buy lunch on Friday. That does nothing, because the cause is the schedule, not the mood.
Ask what actually fills his Monday to Friday:
- Every question from a younger engineer routed to him by default.
- Reviewing everything, because nothing leaves the firm without his initials.
- Client calls he attends because the client asks for him by name.
- Meetings that exist because the last meeting did not produce a decision.
None of those are waste in isolation. Together they are a full time job that produces no design work, and the design work still has to happen. The only place left is Saturday.
The real work needs to live inside the week
The fix is not a wellness program. It is a redesign of who holds what, so that the hours where your best engineer is sharp and available go to the work only he can do.
Three moves do most of the work:
- Name a second reviewer. If only one person can approve, that person is a bottleneck by design. A competent engineer two levels down can check the routine packages. Your senior person reviews the ones that carry real risk.
- Give the questions a home. Put the routine technical questions into a standing block with a named owner who is not your senior engineer. Younger staff get answers faster. He stops being a help desk.
- Protect one long block. Not an empty calendar. A named deliverable with a deadline and no meeting on top of it. A block without an output becomes a block full of interruptions.
Each of these takes a decision from you, not a tool. That is why they often do not happen. The tool is easier to buy than the decision is to make.
Why this is an owner problem and not an engineer problem
You built the habit. Every time a question got routed to your best engineer because it was faster, you taught the firm that his attention is free. Every time you let a review wait for him rather than training a second reviewer, you made the weekend necessary.
Rewarding it makes it worse. If the person who works Saturdays is the one who gets promoted and praised, everybody learns that the path up runs through the weekend. The engineers who want a life leave, and the ones who stay build the same pattern into their own weeks.
The math is ugly at the firm level too. A senior engineer who is the only reviewer, the only client contact and the only person who can sign is a single point of failure for every project at once. One resignation, and the bottleneck becomes a crisis.
What to watch to know if it is getting better
Do not measure this with sentiment. Measure it with when the work happens.
Pull one quarter of activity from your systems and look at the share of senior engineering work that lands outside weekday hours. Then look at it before and after you make one of the changes above. If the weekend share drops while project delivery holds, the redesign worked. If it drops and delivery slipped, you moved the wrong thing.
Two other numbers matter. The number of people who can review and sign a routine package, which should go up. And the number of projects where a single engineer is the only named contact, which should go down.
That is the honest test of whether you run a firm that depends on one person's Saturdays, or a firm where the senior people do their real work on the same days as everybody else.
What to do next week
Pick your best engineer and look at his calendar for one week. Count the meetings and the questions he fields that somebody else could have handled. Then name one person who will take the routine reviews off him, and tell both of them in the same conversation.
Do not ask him whether he is okay with working Saturdays. He will say he is. Ask him which part of the week he would cut if he could, and then cut it.
From the book Engineer Your Freedom
Michael Groselle, P.E., is the founder of Modern Engineering Solutions, a multi-state water and wastewater engineering firm. He left salaried engineering in 2017 and built the firm from one resignation letter and zero clients to more than $2M in annual revenue, with a team of 37 and 525+ completed projects.